Spotlight Projects
Enoree Phase II Landfill
Greenville County, South Carolina – The County of Greenville has selected ACC to provide the construction quality assurance (CQA) service for the closure of the Enoree Phase II Landfill. The Enoree Landfill closure is the largest landfill closure project for ACC in the State of South Carolina consisting of approximately 80-acres of final cover area. Mr. Scott Callaway, ACC’s vice president of construction services, serves as the CQA project manager for this project and Mr. Robert Brown, P.E. as the certifying engineer.
Twin Chimneys Landfill, Cell 2
Greenville County, South Carolina - ACC was chosen by the County of Greenville as the construction quality assurance (CQA) service provider for the construction of Cell 2 at the Twin Chimneys Landfill. This project involves the construction of an approximately 7-acre Subtitle-D cell, at this site located in Southern Greenville County along Highway 25, near the Laurens County border. Mr. Scott Callaway, ACC’s vice president of construction services, serves as the CQA project manager for this project and Mr. Robert Brown, P.E. as the certifying engineer.
Live Oak MSW Landfill Closure
Waste Management, Inc.(WM)- Atlanta, Georgia - ACC was selected to provide construction quality assurance (CQA) services for the closure of WM’s high profile Live Oak Landfill in Atlanta Georgia. The approximately 100 acre closure project is the largest single landfill closure project constructed in the State of Georgia and is thought to be the largest WM closure project as well. The project involved the placement of over 600,000 cubic yards of soil cover and over 8 million square feet of geosynthethic materials. ACC staff provided full time construction observation for the project utilizing ACC’s senior construction quality assurance monitors, Joe Emmons and Tim Schreiber, and certification of the construction by Richard Deason, P.E.
Candler Road MSW Landfill Cell 4 Construction
Hall County Board of Commissioners - Hall County, Georgia - The Hall County Board of Commissioners provided ACC its first design project with the award of a contract to assist the County with the construction of Cell 4 of the Candler Road MSW Landfill
. Services provided included preparation of construction drawings, bid documents and specifications, construction Administration engineering, and construction quality assurance services for the approximately 5 acre composite lined cell. Construction of the cell included the placement of over 15,000 cubic yards of clay and approximately 218,000 square feet of 60 mil HDPE liner. The project also included construction of a new storm water detention/sedimentation basin.
Annual Landfill Gas System Operation and Maintenance
Allied Waste, Inc. (AW) - Alabama District Landfills - ACC executed an addendum with AW to provide annual landfill gas system operation and maintenance at their BFI Alabama District’s Sand Valley MSW Landfill in DeKalb County, AL and Pine View MSW Landfill in Walker County, AL. Pine View’s system consists of 43 extraction wells, 3 condensate sumps, and a utility flare. Sand Valley’s system consists of 33 extraction wells, 1 condensate sump, and a utility flare. ACC’s Vice-President of Landfill Operations Joel Scott provides routine and emergency maintenance and operation of these systems.
Annual Groundwater Monitoring Contract
Waste Management, Inc. (WM)- South Carolina Landfills - WM’s South Carolina District selected ACC as their preferred consultant to conduct the semi-annual groundwater and surface water sampling events and monitoring reports. ACC evaluates and documents the semi-annual groundwater monitoring results in reports sealed by Vice-President of Geotechnical services, Chris Klamke, P.G. The reports are transmitted to WM for submittal to the appropriate regulatory agency. The contract includes monitoring at WM’s Carolina Grading, Richland, Oakridge, Hickory Hill, and Palmetto landfills in South Carolina as well as WM’s landfill in Savannah, Georgia.
Highway 40 Watermain Extension
St. Mary’s, Georgia - ACC was selected to design an extension to the City of St. Mary's water system in Camden County, GA. The extension began along Spur 40, continued along State Route 40, through several residential areas until terminating in the Downtown Historic District. The extension included approximately 20,000 linear feet of 12-inch diameter water main, 25 fire hydrants, and over 15 tons of associated fittings and valves. ACC staff prepared preliminary design documents utilizing the City’s GIS database and Record Documents. Upon acceptance of the preliminary design, ACC coordinated field surveying of the route, wetlands delineation and permitting and Georgia DOT permitting. Services provided included preparation of construction drawings, bid documents and specifications, and construction administration engineering.
Garrett Industrial Warehouse
Chatham County, Georgia - ACC was selected to provide civil engineering services for the design and construction of an approximately 600,000 square foot industrial warehouse with associated rail spur to serve the bustling port of Savannah, Georgia. Services provided included preparation of construction drawings and specifications, construction administration engineering, and construction observations. ACC coordinated land surveying, wetlands delineation and architectural efforts by other professionals on the project. ACC’s documents were used to obtain land disturbance and construction permitting for the project from Garden City in Chatham County and an NPDES general stormwater construction permit from Georgia EPD. ACC staff prepared the required Notice of Intent (NOI) for coverage under the NPDES permit and conducted the initial inspection to confirm that the best management practices were installed as designed.